Reconstruction of the Joseph Thompson foot bridge which provided a nice connection between Nonantum and Watertown Square was originally planned to be in place by the end of 2017. The new bridge arrived Wednesday, Watertown News reports.
Categories
[youtube-feed feed=1]
Archives
Tags
40B (20)
alien abductions (61)
Alison Leary (19)
Amy Sangiolo (21)
april fools (40)
Austin Street (48)
Barney Frank (76)
Bob Kraft (36)
Brooke Lipsitt (102)
Charter Commission (27)
Chestnut Hill (25)
Chestnut Hill Square (76)
David Fleishman (30)
Donald Trump (25)
Emily Norton (28)
Frank Santo (20)
Gail Spector (18)
history (2269)
jacobson (20)
Jake Auchincloss (38)
Joe Kennedy III (30)
MBTA (25)
NewCAL (23)
Newton (45)
Newton Centre (36)
Newton Highlands (74)
Newton Nomadic Theater (28)
Newton people (19)
Newton Public Schools (19)
Newtonville (60)
NewTV (48)
Northland (34)
politics (83)
recreational marijuana (35)
Ruthanne Fuller (77)
Scott Lennon (44)
Senate (65)
Setti Warren (38)
Susan Albright (26)
trees (39)
Upper Falls (81)
video (23)
Village 14 blog (144)
Washington Place (22)
Webster Woods (21)

It’s about time! Very unhappy with how long it’s taking to complete the bridge. I hope it will be done before the Dealtry pool opens. It’s a much longer walk for kids to have to walk all the way around.